The coking plant smolder gladly in Duisburg is one of the most modern and largest coking plants of the world.
Even if Thyssen Krupp steel AG appears as a principal client to coke produced here is the coking plant smolder gladly no investment of TKS.Bauherr and owner is the Carbonaria holding company ltd. & CO, which enterprise employs GmbH which effected under the management company KBS coking plant operating company smolder gladly 309 coworkers of the past coking plant August Thyssen.
Chronology
- 1998 permission for the commencement of construction of a coking plant with coke drying cooling.
- 1999 Sicherstellung of the total financing
- March 2000 commencement of construction on a promontory between the Rhine and the TKS Werkshafen smolder gladly in Duisburg.
- 11 April 2000 request for building of a coke wet instead of coke drying fire extinguishing system. (Construction costs lowering around approx. 100 millions ")
- 28. February 2002 permission for the establishment and enterprise of a coking plant with coke wet deletion on the area in the port smolder gladly gives.
- 26. March of 2002 members of the citizens' initiative against environmental poisons you north registered association insert contradiction during the district government Duesseldorf against change permission.
- 12. March 2003 sample pressures with initial problems
- 13. March 2003 of official kind of operation of the first furnace battery after against start-up rejected the Administrative Court Duesseldorf an express request.
- 16. April 2005 deactivation "of the predecessor "coking plant August Thyssen
Characteristic data
- Construction period approx. 3 years
- Total construction costses approx. 800 millions euro
- Financing banks: Commerzbank, Helaba, WestLB, BayernLB, KfW
- 2 batteries with jweils 70 coke ovens
- Battery manufacturer ThyssenKrupp EnCoke
- Kohlebdarf Pa 3.8 millions t
- Central shelter tower 70 m highly, capacity 3,000 t of rough coals
- z. Time largest coke ovens of the world with the masses: Height: 8,32 approx. 0.59 20.8 m m/Breite
- Utilizable volume per furnace 93 m
- Chamber filling (at 10% wetness) approx. 79 t
- Coke time approx. 25 h, per furnace approx. 55 t coke
- Pressing procedures per day 135
- About 70% of the coke need are covered for coke production Pa 2.5 millions t, thus by TKS.
- cleaned coking gas approx. 155,000 m /h
- wooden (LBH) 16 m70 m
black side
- 2 wet cooling systems with ever a
- 2 fire fighting water purification plants
- 2 Koksrampen
white side
- Tar divorce, gas pre-cooler, electrical tar filter, gas Auger
- Coal water filter, gas scrubber and washing water distillation
- Claus plants, VTX production
- Tank and shipping mechanism for Rohteer, raw benzene and liquid sulfur
- Tank and unloading mechanism for wash oil and caustic soda solution
- Cooling system and artificially respirating system
The coke wet cooling effected in the again-developed CSQ procedure (Coke Stabilizing Quenching) which the dust load under the permissible value for coke wet cooling from 50 mg/t coke to lower is. The cooled down coke is transported over conveyors to the Kokssieberei. In the Kokssieberei the coke is sorted according to size and continued to bring over volumes or railroad cars to the blast furnaces TKS Schwelgern.
Characteristic
Contrary to old industrial buildings this coking plant was arranged after a color concept by Friedrich Ernst von Garnier. Bright of green tones with accents of blue and yellow prevail. These colors are to merge the Industriekoloss into the river landscape coloured.