The arrangement or ascertainment of need stage is the deepest Fertigungsstufe in the one part in a product structure is used. With the help of the component level during the ascertainment of need need dates and lot sizes are determined.
One calls the expiration section of the manufacturing between two manufacturing levels Fertigungsstufe, whereby manufacturing levels are the levels of a product structure specified on the basis of production run criteria (manufacturing parts list contrary to the structure of a construction parts list). Same parts or building groups are down-pulled with the determination of the component level on the deepest Fertigungsstufe.
During production planning and - control is usually determined the component level during the administration of the multi level bill of materials.
see also ascertainment of need strategies, - methods and - proceeding
We found here 3 related websites.
Index | Privacy | Terms Of Use | Sitemap | Feedback