The production part acceptance procedure (English: Production part Approval Process (PPAP)) is a procedure, with which production items are sampled. This proceeding originates from the automobile industry and for years is successfully converted there. It concerns particularly the quality of the supplied parts, that means that the parts from the series tools and/or series processes must correspond to the designs. Beside the parts supplied for examination the first sample test report in such a way specified places (EMPB) (English: part tender warrant (PSW)) a central element for the sampling process. In it all important information is combined and documented into requirements and tests.

The exact procedure for example with the order of the parts and also the supply differs from enterprises to enterprises quite very strongly. Same applies also to the time of sampling. Thus sensitive parts for a long time before Serienanlauf sampled during other parts before production start at sampling to arrive only directly.

All sampling is however one common: The organization to 5 different levels of sampling:

  • Even 1: Only the partial collecting main confirmation (PSW) is submitted to the customer;
  • Even 2: Partial collecting main confirmation (PSW) with sample parts and reduced supporting data are submitted to the customer;
  • Even one 3: Partial collecting main confirmation (PSW) with sample parts and comprehensive supporting data are submitted to the customer;
  • Even 4: Partial collecting main confirmation (PSW) and other demands, as they were specified by the customer;
  • Even 5: And complete supporting data stand for partial collecting main confirmation (PSW) with sample parts at the production location

the supplier for an evaluation for the order;

During sampling different status are then specified, which it give a statement about it, whether the parts correspond to the demands, to be done over again to have or even completely again to be requested have. This status however again completely individually depending upon enterprises are specified.

In principle there are some substantial demands, which apply to all enterprises however with the production part acceptance procedure. In addition a representative production run counts. This production run must cover one until eight hours, with a specific output of at least 300 sequential parts (excerpt from the AIAG demand (of automotives Industry Action Group)):

In addition further 19 demands are generally described, which are simply listed in the following, but to be not further explained:

  1. 1. Design recordings/Design record
  2. 2. Documents over technical changes/engineering CHANGE document
  3. 3. Technical release/engineering Approval
  4. 4. Construction - possibility of error - and - influence analysis/Design failure mode and Effects analysis
  5. 5. Process flow charts/Process flow Diagrams
  6. 6. Process - possibility of error and influence analysis/Process failure mode and Effects analysis
  7. 7. Results of measurement/dimensionally Results
  8. 8. Material and performance inspection/record OF material/performance test Results
  9. 9. Investigations for the short time ability of the processes/initial Process Studies
  10. 10. Analysis of measuring systems/Measurement system analysis Studies
  11. 11. Documentation of a qualified laboratory/Qualified Laboratory documentation
  12. 12. Control (test) flat/control plan
  13. 13. Partial collecting main confirmation/part tender Warrant
  14. 14. Report for the release of the appearance/Appearance Approval report
  15. 15. Check list "“demands on process engineering products"”/Bulk material requirement check list
  16. 16. Sample - production items/SAM-polarize Production parts
  17. 17. Reference samples/masters SAM-polarize
  18. 18. Specific inspection devices/Checking AIDS
  19. 19. Customized demands/Customer Specific requirement

Articles in category "Production part acceptance procedure"

We found here 3 articles.

P

» Poka Yoke
» Process analysis
» Production part acceptance procedure

Related Websites

We found here 5 related websites.

Page cached: Wednesday, July 5, 2006 14:58:39
Valid XHTML 1.0!  Valid CSS!

Page copy protected against web site content infringement by Copyscape